GTC Engineering has knowledge, experience and a history of fabricating and installing every type of crane tie from adjustable, offset, and complex configurations through to internal bracing and external climbing ties. Our advantage is experience, so any problems that arise during time sensitive installs can be alleviated through pre-planning or knowledgeable, prompt and job-specific Engineering changes. Safe removal of ties at the completion of the project is considered in any tie fabrication.
GTC Engineering fabricated, installed and site welded all the components for the Ladder Climbing Tower Crane system used by Caelli Constructions at “Victoria One”, one of Melbourne’s tallest buildings. This was the first time this system was used in Victoria.